Making full use of my Christmas pass, to spend uninterupted time in my cave........ good progress has been made on the Phaeton.
I have finished the roll bar by welding in a cross bar for the seat belt top fixings, out of the same diameter tube. Smoothing out the welds so it will appear seamless, welded on the bottom fillets and completed the welding around the shock top mounts, now I have them in the correct position. The whole assembly has now been removed and is ready to go off to…
ContinueAdded by Paul Sheridan on December 29, 2011 at 20:53 — 9 Comments
© 2024 Created by Tim Walker (The Bodger). Powered by